Skip to main content

bess

Storage Application

FLEXINVERTER

Integrated power conversion solution for solar and battery energy storage applications.

Enable reliable, cost effective and dispatchable power for your Battery Energy Storage Systems (BESS) project

flex

GE Vernova has accumulated more than 30 gigawatts of total global installed base and backlog for its inverter technology* and led the development of the first 1,500-volt introduced to the solar market. GE Vernova also has 15+ years of experience in solar & storage systems. Building on this proven energy technology, GE Vernova’s FLEXINVERTER brings GE Vernova’s technology leadership together with its system integration capabilities to deliver a complete solar and battery energy storage power conversion solution. The FLEXINVERTER platform provides a configurable solution that can help reduce CAPEX, OPEX and helps to ensure more reliable plant performance.

 

READ THE LATEST PRESS RELEASE

Key Differentiating Features

  • GPS accuracy for fault time stamping, compliant to CASIO & MISO requirements

  • 40kA medium voltage short-circuit withstand capability, simplifies substation design & procurement

  • Grid Integration & Grid Forming Control, keeping pace with industry standards

  • Revenue Grade Metering option

  • Up to 290kA tested DC short circuit withstand

  • Up to 150kVA of customer auxiliary power & low voltage distribution built into FLEXINVERTER for simplified BESS container auxiliary power supply

Up to date models & support

In house modeling & consulting team dedicated to our FLEXINVERTER & FLEXIQ products

  • PSS/E

  • PSLF

  • PowerFactory

  • EMT Model (PSCAD)

  • Harmonic/Norton Model

  • Short Circuit Model

  • In addition to supporting development of new codes and standards

Plug & Play

Containerized BESS solution for ease of logistics and reduced on-site installation and commissioning.

High Availability

Robust design, advanced remote monitoring and diagnostics, supported by a world class field services team to deliver greater than 98% availability.

Digital Ready

Integrates with GE Vernova’s FLEXIQ for smooth asset management and remote monitoring and diagnostics capability to improve return on investment and reduce operating risk

CAPEX Saving Features

Optimize project construction costs with the FLEXINVERTER Distributed auxiliary power option & 40KA short circuit capabilities  

Grid Forming & Black Start

Voltage source control, grid forming or black start capabilities.

Dispatchable Reactive Power

Deploy reactive power resources any time, day or night.

Complete power conversion solution

GE Vernova’s FLEXINVERTER Battery Energy Storage Power Station combines GE Vernova’s inverter, with medium voltage power transformer, optional MV Ring Main Unit (RMU), high-power auxiliary transformer and other configurable options within a compact 20ft ISO high-cube container. This containerized solution delivers a reliable, cost-effective, plug & play, factory integrated power conversion system platform for utility scale battery energy storage applications.

  • FLEXINVERTER BESS Power Station

    FLEXINVERTER BESS Power Station
  • FLEXINVERTER Standalone

    FLEXINVERTER Standalone
  • FLEXIQ Plant Control

    FLEXIQ Plant Control
  • Services Offering

    Services Offering
  • Inverter + Pad Mount Transformer (UL)

  • Inverter + Transformer + Medium Voltage Switchgear (IEC)

  • 40 kA MV short circuit option

  • 150 kVA of aux power support

  • GPS fault time-stamping

  • Revenue Grade Metering

  • ISO high cube 20ft container

  • FLEXIQ enabled

  • 4.4 - 5.0 MVA power capability

  • >98% availability

  • AC- & DC- coupling configurations

  • Advanced grid features & grid compliance

  • UL & IEC configurations

  • Standalone Inverter or PCS

  • Up to date grid models & support

  • Provides integration for standalone PV, PV + BESS, and PV + BESS + wind configurations.

Accommodates AC and DC coupling as well as standalone configurations.

  • Manages voltage, power factor, and reactive power capabilities to meet overall plant grid requirements.

  • Incorporates PV signals into the overall plant level SCADA

GE is uniquely positioned with a broad portfolio of services including transactional and Long-Term Services agreement (LTSA) that ensure the highest level of availability, sustainability and efficiency for Solar Power and BESS operations.

  • Extended service agreements up to 20 years.

  • Installation support & Commissioning Service.

  • Maintenance & Repair

  • Modernizations & Upgrades

  • Spare Parts & Obsolescence Management

  • Product Training

Ready to get started?
Contact a GE Vernova specialist today