About Bill of Material (BOM)
A Bill of Material (BOM) contains BOM formulations that define a list of items and the quantity of each BOM item needed to produce a product. BOM items are defined and associated with BOM formulations in Plant Applications.
Using Route Editor, you can perform the following tasks:
- Link a BOM formulation to a route.
- Link BOM items to operations in the route.
- Synch the BOM item changes from BOM Editor.
After the route is released and used in a work order, you can provide details on the actual quantity of BOM items that are consumed, using the Work Queue module. This allows you to keep a track of the quantity of material that is consumed.