Jump to main content
Configure a Write activity
- Prerequisites
Procedure
- In the navigator, click .
- In the resource type list, select a resource.
- In the Displays panel, click .
- Click the Workflow Editor tab.
- Double-click the step containing the activity you want to work with.
- Click the ellipsis button.
The Select Variable dialog box appears.
- Select the variable that the value is written to, and then click OK.
Note: You must match the data type with the value to be written.
- On the activity configuration panel, in the Value field, enter a value.
The Select Variable dialog box appears.
- If required, create an expression or perform a bind to set parameter values.
- Click OK, and then click Save.