Provide the Completed Quantity for an Operation
Before you begin
If you do not have the permission to perform this task, a message appears, stating the same. If that happens, request your administrator to provide the permission using Security.
Perform the following steps for the lot for which you want to mark the operation complete:
About this task
After you perform an operation on a lot, you can provide the quantity of the lot on which you have performed the operation.
You can provide the completed quantity only if the following conditions are satisfied:
- The product is non-serialized.
- The operation requires clocking on (as defined in Route Editor or the ERP system).
- You have specified the BOM consumption for all the mandatory BOM items for the quantity of the lot that you want to mark complete. For example, in a lot of eight items, if you have performed the operation on two items, you must specify the BOM consumption for the two items. The quantity of the consumed BOM items must be greater than or equal to the required quantity to perform the operation.
- You have provided data for all the mandatory quality variables for the lot that you want to mark complete.
- The lot is clocked on by you.