Link a BOM Item to a Single Operation
About this task
Before you begin
- Ensure that the route is linked to the BOM formulation that is associated with the BOM items that you want to link. To do so, in the Edit Route window of the route, select the appropriate value in the BOM Formulation box.
- Create an operation in the route.
Procedure
-
Access the route that is linked to the operation to which you
want to link a BOM item.
The Edit Route page appears, displaying a list of operations linked to the route.
-
Select BOM.
The BOM workspace appears, displaying a list of BOM items in the PRODUCT DESCRIPTION column. The SEQUENCE, PRODUCT CODE, QT PER, and UOM columns are populated with the sequence number of the BOM item, the product code, the quantity needed per operation, and the units of measure of the associated BOM formulation, respectively. You cannot modify these values.
-
For each operation, select a value in each column as described
in the following table.
Note: You can link a BOM item to an operation only if ALL OPERATONS is selected in the Operations section.
Column Description OPERATION Contains a list of operations that you have added to the route. Select the operation that you want to link to the BOM item. You can select just one of the operations. If a BOM item is already assigned to an operation, the operation does not appear in the list. If the behavior of an operation is set to Non Clocking, the operation does not appear in the list. MANDATORY Identifies whether the BOM item is required to perform the operation. By default, the value in this box is No. - Select Save.
Results
Note: Select to synch the latest BOM item details. The page is updated with
any changes made to BOM items in BOM Editor.