In the upper-right corner of the page, select , and then select Edit workorder.
The Edit <work order name> page appears, displaying a list of operations in the work order.
Select BOM.
The BOM workspace appears, displaying a list of BOM items in the
MATERIAL DESC column along with the details such as
sequence, material, required quantity, unit of measurement, and number of
substitutions in the SEQ, MATERIAL,
REQ QTY, UOM, and
SUBSTITUTIONS columns, respectively.
In the OPERATION column, select the operation that you want to link to the BOM items. You can only select an operation that is not started. If the behavior of an operation is set to Non Clocking, the operation does not appear in the list.