Clock Off a Serial/Lot

Before you begin

If you do not have the permission to perform this task, a message appears, stating the same. If that happens, request your administrator to provide the permission using Security.

Procedure

  1. Access the work order for which you want to clock off a serial/lot.
    The page for the work order appears, displaying the Current Status section.
  2. Select Clocked On.
    The Clocked On section appears, displaying a list of clocked on or clocked off records for the work order.
  3. In the row containing the combination of the operator, serial/lot, and the operation that you want to clock off, in the ACTIONS column, switch the toggle.
    Note: The toggle in the ACTIONS column is enabled only if the serial/lot is currently clocked on by the operator.