Calculate all RBI Criticality Analyses Associated with a Single Asset or Corrosion Loop

This topic describes how to calculate multiple RBI Analyses associated with a single Asset or Corrosion Loop. You can also calculate:

Steps

  1. Access the Asset Summary workspace of the Asset that is associated with the analyses you want to calculate.

    -or-

    Access the Corrosion Loop that is associated with the analyses that you want to calculate.

  2. In the upper-right corner of the section, select .

    The Analysis Calculation window appears, displaying the calculation progress and a log detailing any errors. If the calculation fails, a list of the required fields appear in an error report at the bottom of the Analysis Calculation window.

  3. After the calculation is complete:

    The RBI Criticality Analysis is calculated.

  4. Optionally, if you want to view the status of all bulk analyze operations, on the upper-right corner of the Risk Based Inspection Overview page, select .

    The Schedule Logs page appears, displaying a list of all the operations in GE Digital APM that are in progress, along with the percentage of completion. You can also access a list of operations that have been successful or have failed.