About Schedule Logs

The Schedule Logs page shows the status of the various processes that are scheduled in the GE Digital APM system. The available statuses, In Progress, Successful, and Failed, are tabs on the Schedule Logs page.

The following image shows the Schedule Logs page.

The Schedule Logs page contains the following sections:

Copyright © 2018 General Electric Company. All rights reserved.