The Resources section contains a grid that displays specific results for the Resources that exist in a System Reliability Analysis.
The grid contain the following columns of information:
Resource: Displays a hierarchy that lists the Resources that exist in the System Reliability Analysis. The Resources appear below the Scenario in the hierarchy to which they belong.
Occurrences: Contains a value that indicates the average number of times the Resource is used during the simulation period.
Note: For System Resource records in which the Count Occurrences field is set to False, the value in this column will be 0 (zero).
Time(Days): Contains a value that indicates the average amount of time, in days, accumulated by the Resource.
Cost (currency): Contains a value that indicates the average cost accrued by the selected Resource.
Action Resource Cost: Contains a value that indicates the total cost of Resource needed for Actions.
Planned Correction Resource Cost (currency): Contains a value that indicates the total cost of all planned Resources needed for Actions.
Unplanned Correction Cost (currency): Contains a value that indicates the total cost of all unplanned Resources needed for Actions.
By selecting a cell in the grid, you can view detailed information in the following graphs: