The Elements section contains a grid that displays specific results for the elements that exist in a System Reliability Analysis.
The grid contain the following columns of information:
Element: Contains a hierarchy that lists the components in the System Reliability Analysis.
Failures: Contains a value that indicates the average number of times the selected item failed during the analysis period for all iterations of the Scenario to which it belongs.
Downtime (Days): Contains a value that indicates the average number of days that the selected item was out of service due to failures or shutdowns for all iterations of the Scenario to which it belongs.
Cost (Currency): Contains a value that indicates the average total cost of the selected item for all iterations of the Scenario to which it belongs. This includes the cost of any items that belong to the item, lost production costs, fixed costs, variable costs, Action costs, planned or unplanned correction costs, and Resource costs.
Reliability: Contains a value that indicates the percentage of iterations that the selected item never failed across the total number of iterations in the Scenario to which it belongs.
Note: Reliability is calculated from actual data collected from the iterations and does not represent an average value.
Availability : Contains a value that indicates the average percentage of the time that the selected item was available and running for the Scenario to which it belongs.
Next Failure (Days): Contains a value that indicates the average amount of time, in days, from the analysis Start Date until the next failure occurs for the selected item.
Action Cost (currency): Contains a value that specifies the average Action cost across all the iterations. Action cost includes any materials or personnel needed to complete any Actions that exist in the Scenario and any Resources used to complete the Actions.
Lost Production Cost (currency): Contains a value that indicates the average lost production cost across all iterations. Lost production cost includes the cost of lost production for any element when it is stopped or unable to run, according to the value in the Lost Product Cost field of the record that represents that element.
Planned Correction Cost (currency): Contains a value that indicates the average planned correction cost across all the iterations. Planned correction cost includes the cost to repair an element that is identified as having a potential failure by an inspection or condition monitoring Action and any Resources used.
Unplanned Correction Cost (currency): Contains a value that indicates the average unplanned correction cost across all the iterations. Unplanned correction cost includes the cost to repair any failed element and any Resources used to do so.
By selecting a cell in the grid, you can view detailed information in the following graphs: