In the Route Editor page, perform one of the following tasks:
If you want to create a revision of a released route, select Released.
If you want to create a revision of an archived route, select Archived.
Select the route whose revision you want to create.
The View Route page appears.
Select , and then select Revision.
The Revise Route window appears, displaying the route details.
Note: The name, description, production line, material, and BOM formulation are copied from the latest version of the route. You cannot modify these details. You can add, modify, or remove an operation. You can also assign a different BOM item, equipment, property group, or document.
Select Next.
The Edit Route page appears. The operations, resources, BOM items, properties, and documents linked to the route are the same as that of the latest version of the route.
As needed, add, modify, or remove operations, or assign a different BOM item, property, or document.
Select Save.
Results
The route revision is created and is in the draft state. The value in the REVISION box is incremented by 1.
Tip: To access the previous versions of the route, in the Released or Archived section, select in the row containing the route.