Rerun an ASO Simulation in ASM

When an Asset, System or Unit strategy is in simulation mode the charts in the Risk Analysis and Review Strategy pages reflect the results of the last simulation for the proposed scenario in ASO, in turn derived from the strategy in ASM. Any changes to the strategy will therefore render the chart views out of date and it will be necessary to rerun the simulation to update them.

Steps

  1. Access the ASM Overview page.
  2. Select an asset strategy that has been optimized.

    Note: When making changes to an Asset Strategy, the changes will only be reflected in the linked optimization scenarios when the simulation has been rerun.

    The Strategy Details workspace for the selected asset strategy opens.

  3. As needed, modify the asset strategy, and then select .
  4. In the left pane, select the Review Strategy tab.

    The Review Strategy workspace appears.

  5. At the top of the workspace, underneath the name of the strategy, a message appears, indicating that the values for the simulation have been modified.

    To rerun your simulation, select Run Simulation.

  6. In a new tab, the ASO Analysis Summary appears, and the simulation automatically runs.

    IMPORTANT: If the analysis does not have complete, valid information for the simulation, a message will appear, indicating that the information in the simulation needs to be corrected. The incorrect fields will be highlighted in red until the simulation has been corrected and saved.

Copyright © 2018 General Electric Company. All rights reserved.