The Static Data job populates the database with static site information. This topic describes how to run this job.
Steps
Open and log in to the APM Connect Administration Center web application.
Note: The user logging in must have access to the Job Conductor by being designated the Operations Manager role. By default, users designated admin do not have Job Conductor permissions.
Select Run.
The static data pull is enabled.
You can now execute jobs.
Copyright © 2018 General Electric Company. All rights reserved.