A What-If Analysis is a child analysis of a main RBI Analysis (or another What-If Analysis in the Risk Completed state) that allows you to calculate the risk associated with an RBI Component under hypothetical circumstances. What-If Analyses allow you to analyze hypothetical situations to determine how operational and procedural changes would impact the risk associated with a component's failure on a certain date.
When you create a What-If Analysis:
A record of the RBI
Note: For a normal RBI Analysis, the value in the Event Type field is blank.
Risk Category
Risk Completed
Risk Completed Date
Average Leak Rate
Cleanup Cost
Deinventory Time
Distance to End Effect
Estimated Leak Quantity
Estimated Release Rate
Final Phase
Flammable Affected Area
Initial Leak Rate
Leak Size
Pool Area
Probability of Ignition
Release Duration
Toxic Mix Release Rate
Toxicity Area
Combined Consequence
Inspection Priority
Probability of Failure
Adjusted Years Last Inspection
DF
Likelihood Category
Updated Potential
Years in Service
Years Last Inspection
DF
Estimated
Estimated Wall Loss
Fractional Wall Loss
Likelihood Category
Pressure at Minimum Thickness
Structural Minimum Thickness
Wall Ratio
Years in Service
Age
Area Humidity Factor
Calculated Corrosion Rate
Coating Factor
DF
Estimated Minimum Thickness
Estimated Wall Loss
Fractional Wall Loss
Insulation Condition Factor
Insulation Type Factor
Likelihood Category
Wall Ratio
Years in Service
Copyright © 2018 General Electric Company. All rights reserved.