The following table lists the licenses that can be activated via Operations Manager and the modules/features that are activated with each license.
This license: | ...Activates this module/feature: |
---|---|
AMS Analytics | AMS Analytics |
APM Connect Basic | APM Connect |
APM Connect Plus | APM Connect |
APM Connect Studio | APM Connect |
Asset Answers |
Note: The product features related to this license have been deferred, or no action is required to activate this license. |
Asset Health | Asset Health Manager (AHM) |
Asset Strategy Management | Asset Strategy Management |
Asset Strategy Optimization | Asset Strategy Optimization (ASO) |
Calibration | Calibration Management |
Cognitive Analytics | Cognitive Analytics |
Criticality Calculator | Criticality Calculator |
Developers |
Configuration Manager -and- Manage Translations |
eLog | eLog |
Family Policy | Family Policy |
GE System 1 Integration |
GE Analytics |
Generation Availability Analysis (GAA) |
Generation Availability Analysis (GAA) |
Hazards Analysis |
Hazards Analysis -and- Layers of Protection Analysis (LOPA) |
ISO Risk | Custom |
Incident Management | Custom |
Inspection |
Inspection Management -and- Inspection Field Data Collection |
Language-<Supported Language> | Translations for the Licensed Language |
Life Cycle Cost Analysis (LCC) | Life Cycle Cost Analysis (LCC) |
Lubrication Management | Rounds |
MOC | Management of Change (MOC) |
Maximo Interfaces | APM Connect Maximo Adapters |
Meridium APM Web Framework |
Note: The product features related to this license have been deferred, or no action is required to activate this license. |
Meridium Core |
GE Digital APM Core Functionality and all of the following modules/features:
|
Metrics Manager | Metrics and Scorecards |
NR13 | Inspection Management |
OPC Interfaces | Process Data Integration |
OSI PI Interfaces |
Note: The product features related to this license have been deferred, or no action is required to activate this license. |
Operator Rounds | Rounds |
Oracle eAM Interfaces |
Note: The product features related to this license have been deferred, or no action is required to activate this license. |
PROACT | Root Cause Analysis |
Pipeline Management | Risk Based Inspection |
Policy Designer | Policy Designer |
Production Loss Accounting | Production Loss Analysis (PLA) |
RBI 581 | RBI 581 |
RCM |
Failure Modes and Effects Analysis (FMEA) -and- Reliability Centered Maintenance (RCM) |
Reliability Manager | Reliability Analytics |
Risk Based Inspection | Risk Based Inspection (RBI) |
SAP Content for ASI | Asset Strategy Implementation (ASI) |
SAP Criticality Assessment |
Note: The product features related to this license have been deferred, or no action is required to activate this license. |
SAP Integration Interfaces | APM Connect SAP Adapters |
SAP Process Integration | SAP PI Adapters |
SAP Technical Characteristics | APM Connect SAP Adapters |
SAP Work Management | APM Connect SAP Adapters |
SIS Management |
SIS Management -and- Layers of Protection Analysis (LOPA) |
Thickness Monitoring | Thickness Monitoring (TM) |
Copyright © 2018 General Electric Company. All rights reserved.