Import Baseline Rules

Note: If you are upgrading Production Loss Analysis from a starting version that is earlier than V3.6.0.0.0, this procedure must be completed before upgrading the Meridium Enterprise APM Server and Add Ons software on the Meridium Enterprise APM Server(s). This procedure is part of the upgrade Meridium Enterprise APM and upgrade Production Loss Analysis workflows.

Steps

  1. On the GE Digital APM Server, via the Windows start button, access Configuration Manager.

    The Meridium APM Login window appears.

    GE Digital APM Login window

  2. Enter your User ID and Password into the appropriate boxes, and then, in the Data Source box, select the baseline GE Digital APM database whose version number matches the version number of your current, pre-upgraded database.
  3. Select Login.

    Configuration Manager opens.

  4. On the top navigation bar, select Tools, and then select Import/Export Meridium Metadata.

    The Import/Export Metadata window appears.

    Import/Export Metadata window

  5. Select the Export check box, and then select Select File.

    The Save As window appears.

  6. Navigate to the location where you want to save the exported metadata, then enter a name in the File name: box, and then select Save.

    The Save As window closes, and the selected filepath is displayed in the Select File box on the Import/Export Metadata window.

    Import/Export Metadata window with a file selected

  7. Select the Selection check box.
  8. In the drop-down list box to the right of the Family Rule Projects check box, select Some.

    The Select Rule Projects to Export window appears.

    Select Rule Projects to Export window

  9. In the Available Items section, select the item whose Family Caption is Production Event, and then select .

    The selected item appears in the Selected Items section.

  10. In the Available Items section, select the item whose Family Caption is Production Profile, and then select .

    The selected item appears in the Selected Items section.

    Select Rule Project To Export window with selected items

  11. Select OK.

    The Select Rule Projects to Export window closes, and, on the Import/Export Metadata window, the Family Rule Projects check box is selected automatically.

    Import/Export Metadata window with projects selected

  12. Select Export.

    The Metadata Import/Export Status dialog box appears, displaying a progress bar. When the export is complete, a message appears, asking if you want to save the log.

    Metadata Import/Export Status dialog box

  13. Select Save Log.

    The Save As window appears.

  14. Navigate to the location where you want to save the export log, then enter a name in the File name: box, and then select Save.

    The Save As window closes.

  15. On the Metadata Import/Export Status dialog box, select Close.

    The Metadata Import/Export Status dialog box closes.

  16. On the Import/Export Metadata window, select Close.

    The Import/Export Metadata window closes.

  17. In Configuration Manager, on the top navigation bar, select File, and then select LogOff.

    A dialog box appears, asking if you are sure that you want to log off.

  18. Select OK.

    Configuration Manager closes.

  19. On the Meridium Server machine, via the Windows start button, access Configuration Manager.

    The Meridium APM Login window appears.

    GE Digital APM Login window

  20. Enter your User ID and Password into the appropriate boxes, and then, in the Data Source box, select your current, pre-upgraded database.

  21. Select Login.

    Configuration Manager opens.

  22. On the top navigation bar, select Tools, and then select Import/Export Meridium Metadata.

    The Import/Export Metadata window appears.

  23. Select Select File.

    The Open window appears.

  24. Navigate to and select the file that you saved in step 6, and then select Open.

    The Open window closes, and the selected filepath is displayed in the Select File box on the Import/Export Metadata window.

    Import/Export Metadata window with import file selected

  25. Select the Selection check box.
  26. In the drop-down list box to the right of the Family Rule Projects check box, select Some.

    The Select Rule Projects to Import window appears.

    Select Rule Projects to Import window

  27. In the Available Items section, select the item whose Family Caption is Production Event, and then select .

    The selected item appears in the Selected Items section.

  28. In the Available Items section, select the item whose Family Caption is Production Profile, and then select .

    The selected item appears in the Selected Items section.

    Select Rule Project to Import window with selected items

  29. Select OK.

    The Select Rule Projects to Import window closes, and, on the Import/Export Metadata window, the Family Rule Projects check box is selected automatically.

    Import/Export Metadata window with projects to import selected

  30. Select Import.

    The Metadata Import/Export Status dialog box appears, displaying a progress bar. When the import is complete, a message appears, asking if you want to save the log.

    Metadata Import/Export Status dialog box

  31. Select Save Log.

    The Save As window appears.

  32. Navigate to the location where you want to save the import log, then enter a name in the File name: box, and then select Save.

    The Save As window closes.

  33. On the Metadata Import/Export Status dialog box, select Close.

    The Metadata Import/Export Status dialog box closes.

  34. On the Import/Export Metadata window, select Close.

    The Import/Export Metadata window closes.

  35. In Configuration Manager, in the left pane, select the Production Event folder.
  36. In the Tasks section of the workspace, select Compile Family.

    The Family Compile window appears.

    Family Compile window

  37. In the Family Compile window, select Compile.

    In the Family Compile window, a progress bar appears, and successfully compiled families appear in a list as the operation progresses.

  38. When the progress bar reaches the end, select Close.

    The Family Compile window closes.

  39. In Configuration Manager, in the left pane, select the Production Profile folder, and then repeat steps 36 through 38.

    The necessary baseline rules have been imported into your current, pre-upgraded database.

Related Information

Copyright © 2018 General Electric Company. All rights reserved.