IMPORTANT: This procedure does not work in an Active scenario.
Steps
In the left pane, select a scenario.
In the scenario workspace, select the Risks tab.
The Risks section appears, displaying a list of available risks.
In the Risks workspace, select
The New Risk grid appears.
Note: You need to be in the node level of the analysis for the
Select
A message appears, confirming that the risk is saved.
Note: In the Proposed scenario, a
Copyright © 2018 General Electric Company. All rights reserved.