Overview
After nearly 20 years of operation, Uniper’s Enfield power plant needed a solution that could increase life-cycle value and utilization of the power generating equipment, while moving towards decarbonizing the gas power plant by reducing CO2 emissions per MW.
As a result, the GT26 HE upgrade will enable reliable operations at Uniper’s Enfield power plant to generate more energy per unit fuel with lower carbon emissions. It will also improve the plant’s performance by increasing its flexibility, efficiency and output and extend the inspection intervals of the unit.
Outcomes
Read our infographic to know more on the advanced performance benefits of the HE upgrade that blends the bests of F-class and H-class technology.
Case Studies
Contact us