Berlin, Germany (08 July, 2025) – GE Vernova Inc. (NYSE: GEV) today announced it has been awarded a contract by German transmission system operator TransnetBW to modernize the Kühmoos grid node - an important electrical substation in southern Germany that plays a vital role in cross-border power flows and regional grid stability. Once complete, the upgraded site is expected to enhance frequency regulation, voltage stability, and power exchange between Germany, France, and Switzerland.
Strengthening a Strategic Grid Node