The following table lists the fields in RBI records that are used as inputs to Policy record logic. This logic determines the Inspection Strategy record that populates the RBI Recommendation record. Additionally, the table lists the corresponding Input node for each field whose value is used in the policy.
Field | Family | Corresponding Input Node |
---|---|---|
Appendix_B |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
General Corrosion |
Criticality Int. Corr. Deg. Mech. Eval. |
General Corrosion |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Non-Intrusive Requirement Met |
Criticality Int. Corr. Deg. Mech. Eval. |
Non Intrusive Req met |
Appendix_D |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
General Corrosion |
Criticality Int. Corr. Deg. Mech. Eval. |
General Corrosion |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Non-Intrusive Requirement Met |
Criticality Int. Corr. Deg. Mech. Eval. |
Non Intrusive Req met |
Appendix_E |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
General Corrosion |
Criticality Int. Corr. Deg. Mech. Eval. |
General Corrosion |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Appendix_F |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Ext. Corr. Deg. Mech. Eval. |
Half-Life |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Insulated |
RBI Criticality Analysis |
Insulated |
Insulation Damage |
Criticality Ext. Corr. Deg. Mech. Eval. |
Insulation Damage |
Appendix_G |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Damaged At Last Inspection |
Criticality Env. Crack. Deg. Mech. Eval. |
Evidence of Cracking |
Damage Mechanism |
Criticality Env. Crack. Deg. Mech. Eval. |
Internal Inspection |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Is Entry Possible |
Criticality Env. Crack. Deg. Mech. Eval. |
Is Entry Possible |
PT or MT Access |
Criticality Env. Crack. Deg. Mech. Eval. |
PT or MT Access |
Appendix_H |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Appendix_I |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Estimated Half Life |
Criticality Int. Corr. Deg. Mech. Eval. |
Half-Life |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
PRD_Strategies |
||
Criticality Item Type |
RBI Criticality Analysis |
Component Type |
Inspection Priority (Unmitigated Risk) |
RBI Degradation Mechanisms |
Inspection Priority |
Note the following details about Input nodes that are used in these policies but are not listed in this table: