Specify Failure Consequence Values for the Simulation

For each Mitigated Risk that is associated with the Special Action, you can specify the Failure Consequence values that you want to be used in the simulation when the Special Action is completed to mitigate the occurrence of the given Risk.

Steps

  1. Access the Mitigated Risk for which you want to specify the Failure Consequence values.
  2. Locate the row containing the Risk for which you want to specify the Failure Consequence values.
  3. In the New Failure Consequence column, select the hyperlink.

    The Failure Consequence window appears.

    Failure Consequence

  4. In the lower-left corner, select the Replace Failure Consequence check box.

    The fields in the Failure Consequence window are enabled.

  5. In the Fixed Unplanned Correction Cost text box, modify the value as desired.
  6. Select OK.

    The changes are saved, and the values that you specified will be used the next time the simulation is run.