To load data into GE Digital APM using the APM Connect Data Loaders or the EAM Adapters. You must establish the connection between your APM Connect component and GE Digital APM.
Steps
The APM Connect Configuration workspace appears.
In the APM Connect Configuration workspace, configure the parameters on the APM Connect Connection record in the following sections.
General Settings: Established the connection between the APM Connect server and GE Digital APM.
IMPORTANT: The General Settings section must be configured if you are using either the Data Loaders or the EAM adapters.
EAM Settings: Used to schedule work orders, which determine how frequently work orders will be transferred to your SAP.
Note: These settings are only required for the SAP adapters.
Select Save.
The connection between APM Connect and GE Digital APM is established.
Copyright © 2018 General Electric Company. All rights reserved.