About the Risk Based Inspection (RBI) 581 Data Loader Load Verification

After you load data, you should perform the following steps in GE Digital APM to confirm the integrity and accuracy of the data imported from the data loader workbook:

Copyright © 2018 General Electric Company. All rights reserved.