About the Work History Data Loader General Loading Strategy

This section describes any prerequisites to loading the data and the order in which the data will be loaded.

Note: Before reading this section, refer to the Data Model section.

Load Sequence

The Work History and Work History Detail data load must be performed in a specific sequence to successfully populate fields, create records, and link them to the predecessor and/or successor records:

  1. Create or Update the Work History record.
  2. Link the Work History record to the Asset ID (Equipment or Functional Location).
  3. Create or Update the Work History Detail record.
  4. Link the Work History Detail record to the associated Work History record.

Note: There can be multiple Work History Detail records for each Work History record.