Western European Energy Producer
Customer Challenge
Provide grid support and improve ROI through coordination of multi-site wind farms
GE's Solution
The energy producer manages multiple wind farms, totaling more than 100MW of power. GE's GridNode's DER management system provided them with:
- Voltage, reactive power and power factor dispatch at POI
- Equitable dispatch with consideration for network limits
- OLTC control
- Integrated network parameters, DER capability curves, thermal and voltage limits
Customer Benefits
Increased revenues through reactive power services as well as improved asset life through volt/VAR control.
Book a Demo