Benefits

How we get you there

The upgrade is achieved by completely switching off the SEV combustor and maintaining the EnVironmental (EV) combustor in low emission operation. The water steam cycle remains in operation, so the plant can quickly be brought to full load.

Content-ka26-low-load-operation-upgrade

What can upgrading do for you?

  • Increase load flexibility: LLO to base load in < 20 min
  • Reduce fuel costs at lowest minimum environmental load: emission-compliant gas turbine combined-cycle relative load of < 20% at about 35% efficiency
  • Maximum spinning reserve: spinning reserve of > 300 MW in < 20 min (> 600 MW for KA26-2)

Contact us

Contact us today to learn more