Benefits

What can upgrading do for you?

  • Improve startup reliability
  • Improve availability:
    • 180 MW within 30 minutes (KA26-1, GT only, cold start)
    • 580 MW in 43 minutes (KA26-2, 2x GT only, cold start)
  • Reduce startup costs:
    • From GT ignition to full CCPP load in 30 minutes (2x KA26-1) provides more than 30% fuel cost reduction
  • Reduce cumulative emissions—especially CO2
content-ka26-fast-start-benefits-and-time-saving.jpg

How we get you there

Addressing GT synchronization, combined-cycle startup, and GT/ST loading—as well as addressing shut-down periods via warm keeping (or pre-warming)—the Flex Start packages (FS1, FS2, FS3, FS4) allow you to reduce the startup time and associated costs for hot, warm, and cold starts, and at the same time increasing the capability to catch unplanned dispatch opportunities.