7F_gas_turbine.jpg

Benefits

How 7F AGP addresses your needs

Many power producers have specific goals, which can include the challenge of adapting to a changing power grid with ever-increasing renewable generation and fast retiring coal generation. This may mean a need for increased dispatchable plant capacity and widened emissions compliant operational range to reliably backstop intermittent, non-dispatchable renewables, and/or improved heat rate and increased output for more efficient high capacity factor power generation in day-ahead and real-time energy markets. The 7F AGP is a set of solutions that can be configured to achieve the specific level of performance you need to solve the challenges you face in meeting both your current and future power generation goals.

Webinar

The evolving role of firm dispatchable generation: Addressing hyper load growth challenges

Tuesday, September 24th | 11am NYC

We are at a pivotal time in the power industry, where technology advancements intersect with the pressing challenges of load growth, extreme weather normalcy, and grid stability. Discover insights into the last decade of industry changes and their impacts on the 7F combustion turbine fleet.

Jeff Chann

Power Segment Specialist, GE Vernova

Louis Veltre

7F Product Manager, GE Vernova

Solutions

7F AGP options, find your path

Choose the solution that aligns with your plant and specific goals.

  • 7F.03 Simple Cycle
  • 7F.03 Combined Cycle
  • 7F.04 SC
  • 7F.04 CC
  • 7F.05 SC
  • 7F.05 CC

The right package depends on existing equipment, balance of plant constraints, and operating budget, and GE Vernova is happy to work with you to find custom solutions to meet your needs.

 

  AGP Peaker AGP Flex AGP Standard AGP Tech
Best for: Customers looking for a budget option to increase output on simple cycle turbines.

Customers looking for flexible, partial AGP solutions (e.g., for spare/used part inventory synergy).

Customers looking to achieve moderate output gains (e.g., due to costly BOP or transmission constraints limiting output).

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output: up to 4%

up to 5%

up to 5.3%

up to 12%

Megawatts gained:        
Heat rate: up to -1%     up to -1.3% up to -1.9%
up to -2.5%
Hot gas path intervals: 10-16k
24-32k
32k
32k
Cost: $$$$ $$$$ $$$$ $$$$
Additional requirements: Minor controls software adjustments; Compatible with Mark* V, VI, and VIe controls OpFlex* ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 

Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

The right package depends on existing equipment, balance of plant constraints, and operating budget, and GE Vernova is happy to work with you to find custom solutions to meet your needs.

 

  AGP Flex AGP Standard AGP Tech
Best for:

Customers looking for flexible, partial AGP solutions (e.g., for spare/used part inventory synergy).

Customers looking to achieve moderate output gains (e.g., due to costly BOP or transmission constraints limiting output).

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output:

up to 4.5%

up to 4.5%

up to 11.7%

Megawatts gained:      
Heat rate: up to -1% up to -1.3%
up to -2%
Hot gas path intervals:
24-32k
32k
32k
Cost: $$$$ $$$$ $$$$
Additional requirements: OpFlex* ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 
Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

Your 7F.04 unit can achieve improved output and reliability with an AGP Tech conversion upgrade.

 

  AGP Tech Conversion
Best for:

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output:

up to 5.4%

Megawatts gained:  
Heat rate:
up to -0.4%
Hot gas path intervals:
32k
Cost: $$$$
Additional requirements: DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 
Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

Your 7F.04 unit can achieve improved output and reliability with an AGP Tech conversion upgrade.

 

  AGP Tech Conversion
Best for:

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output:

up to 6%

Megawatts gained:  
Heat rate:
up to -0.6%
Hot gas path intervals:
32k
Cost: $$$$
Additional requirements:

DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 
Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

Your 7F.05 unit can aim to achieve its highest level performance with an AGP Tech conversion.

 

  AGP Tech Conversion
Best for:

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output:

up to 5.5%

Megawatts gained:  
Heat rate:
up to -0.7%
Hot gas path intervals:
32k
Cost: $$$$
Additional requirements:

DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 
Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

Your 7F.05 unit can aim to achieve its highest level performance with an AGP Tech conversion.

 

  AGP Tech Conversion
Best for:

Customers looking to achieve state-of-the-art performance via upgrade of their existing turbine.

Output:

up to 6.5%

Megawatts gained:  
Heat rate:
up to -1%
Hot gas path intervals:
32k
Cost: $$$$
Additional requirements:

DLN2.6+ combustor; OpFlex ETS, AutoTune DX, and Cold Day Performance; Mark VIe controls

 
Results for a given project will be a function of gas turbine model, ambient conditions, emission requirements, and other site-specific requirements.

Enhanced technology

What you get with an AGP upgrade

We have re-worked all three stages of buckets, nozzles, and shrouds as part of a systemic approach in which each component complements its counterparts for enhanced overall performance.

  • Refined aerodynamics and better sealing for higher efficiency performance
  • Advanced materials for more durability and reduced component stress
  • Improved cooling technology for higher operating temperatures and greater output

Featured video

AGP in South Korea

Discover the difference an AGP upgrade made for one company in South Korea.

Contact us

Learn how 7F AGP can improve output and performance

*Trademark of General Electric Company