Search GE Gas Power
Or start with a popular search:
A cross-flange rework for leakage elimination can address a hot air leakage in the cross-flange area of your GT13E2 gas turbine.
Benefits
During operation and as start/stop cycles grow, gas turbine casings can begin to deteriorate and become deformed because. Oxidation can cause a loss of surface parallelism and finishing, which results in imperfect contact between mating surfaces. This can create a hot air leakage at the circumferential flanged connection between the combustor and turbine casings (cross-flange).
Benefits of the cross-flange upgrade
Related services
Contact us
Gas Power engineers cleaner, more accessible energy that communities depend on to power growth and prosperity.
Contact usSee how Gas Power is helping to build a world that works.
Learn more