The inspection process

Utilizing Gauge Repeatability and Reproducibility to help ensure defects in components are easily detectable during manufacturing.

Tighter than industry standards

Our gas turbine rotors are engineered and designed to be tighter than industry standards for wheel stacking and balancing.

Unique wheel broaching method

Designed to remove damaged material and perform dovetail slot repairs.

Proprietary rotor wheel repairs

Based on rigorous documentation and tolerances that are 2-3 times smaller than what others can produce—down to .0001 inches.

Forging process developed over 30 years

Developed to help ensure grain size and material composition integrity; crucial to avoiding cracking and other damage.

Rotor bolting built to GE Vernova standards

Built with double melt (VIM + VAR) nickel for tighter tolerance than industry standards and help ensure safe operation.

An eye for quality

An eye for quality

Proven gas turbine rotor manufacturing and repair processes

Through years of fleet and engineering analysis, we have developed proprietary gas turbine rotor manufacturing processes for our B, E, and F fleets that cannot be duplicated.

Planning ahead

Schedule your rotor life maintenance ahead of time

Your rotor is the driving force behind your gas turbine equipment, so it’s important to make sure it will continue to run reliably and efficiently. The energy industry is changing rapidly, requiring plants to cycle in new and different ways to address the increase of renewable power. These shifts are placing ever-increasing stress on all power plant equipment, and rotors are no exception. With many power plants now nearing the end of their operating capacity, it’s more important than ever to reach out to GE Vernova at least 3 to 5 years ahead of your planned outage to address your gas turbine rotor needs.

Solutions

Gas turbine rotor life management and extension solutions

Interested in finding out which rotor life solution is right for you? Start by choosing your rotor type to see and compare the available solutions. See a solution you like? Contact us to discuss the specifics of your plant.

View by rotor type:

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units.

130K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

130K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

130K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

150K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

4800 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

150K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,450 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units.

144K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

min. 5,050 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

100K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers with a long term plan to operate their units

200K
min. factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,000 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

160K
FFH Gained

$$$$

Cost to you

2 to 3

Major Inspection/C-Inspection intervals gained

Additional 4,500(HA.01)
+3,600 (HA.02)

Additional lifetime FFS starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with new rotor

Customers that are planning far in advance and looking to reduce rotor costs.

160K
FFH Gained

$$$$

Cost to you

2 to 3

Major Inspection/C-Inspection intervals gained

Additional 4,500(HA.01)
+3,600 (HA.02)

Additional lifetime FFS starts gained

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

24K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 4,900 factored fired starts

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* can be up to 200K operating hours if you perform RLM at every C-inspection

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers targeting to operate their units only for another couple of years benefiting from lower upfront costs combined with shorter cycle times

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

Varies up to +160K
FFH Gained

$$$

Cost to you

Varies

Major Inspection/C-Inspection intervals gained

Varies up to +4,500(HA.01) Varies up to +3600 (HA.02)

Additional lifetime FFS starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor exchange with refurbished rotor

Customers that want to get back in operation quickly, with lower upfront costs and greater flexibility.

Varies up to +160K
FFH Gained

$$$

Cost to you

Varies

Major Inspection/C-Inspection intervals gained

Varies up to +4,500(HA.01) Varies up to +3600 (HA.02)

Additional lifetime FFS starts gained

* Available hours and starts on refurbished assets are dependent on available inventory, scope of work and operations

More details

Your goal:

Getting your rotor back in operation—FAST—with lower upfront costs and greater flexibility.

Here's what you get:

Our Rotor Exchange program provides you with a gas turbine rotor that has been inspected and if needed, improved to GE’s strict standards, with life still left on the asset. You receive a GE-certified rotor with the latest technology improvements. Best of all, you get it quickly, helping to reduce downtime, especially in emergent situations.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA,GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

100K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 3,300 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

96K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

2,400+

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

96K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

2,500-4,900 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

96K-144K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

2,500-4,900 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

100K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 3,600 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

100K-200K
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

up to 3,600 factored fired starts

Additional lifetime starts gained

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

160K
FFH Gained

$$

Cost to you

2 to 3

Major Inspection/C-Inspection intervals gained

+900 starts optional (7HA.02 only).

Additional lifetime FFS starts gained

* optional starts based extension

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor life extension

Customers that need a cost-effective solution and have a flexible outage window or a spare rotor.

160K
FFH Gained

$$

Cost to you

2 to 3

Major Inspection/C-Inspection intervals gained

+900 starts optional (7HA.02 only).

Additional lifetime FFS starts gained

* optional starts based extension

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

Our rotor life extension solution targets the rotor balancing, repair, replacement and maintenance of individual gas turbine rotor components after a full disassembly and inspection protocol. We can create a customized life extension solution for gas turbine rotor assets that allows for extended operation of two or more additional maintenance intervals.

This solution is compatible with the following gas turbine types:

6B,6F,7E,7F,7HA,9E,9F,9HA

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Typically ~100kOH and 5'050 starts, but unit specific recommendations required.

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor reconditioning

Customers with either multiple assets, outage flexibility or with already a spare rotor at site

Variable*
factored fired hours of additional lifetime gained

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

Variable*

Additional lifetime starts gained

* Available remaining hours and starts after "whack & weld" are dependent on consumed life before the "whack & weld". Unit specific recommendations required

More details

Your goal:

Keeping your existing rotor because you have a flexible outage window and are looking for an economical solution. In addition, you may have a spare rotor that can be used as a seed rotor to extend the life of a broader range of rotors.

Here's what you get:

If you have GT-frame rotors that are approaching their serviceable limit, you can extend their lifetime with a rotor reconditioning, which involves replacing the turbine section with a new one. The remaining life after reconditioning depends on the consumed life (mainly starts) of the compressor section.

This solution is compatible with the following gas turbine types:

GT11D,GT11N,GT11N2 1VGV,GT11N2 3VGV,GT13,GT13E,GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1,GT8,GT9

Rotor Exchange with new rotor w/o RLM

Customers who are not performing RLM at every C-inspection

150K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

3,800

Additional lifetime starts gained

* please refer to GER3620

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

Rotor Exchange with new rotor w/o RLM

Customers who are not performing RLM at every C-inspection

150K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

3,050

Additional lifetime starts gained

* please refer to GER3620

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

Rotor Exchange with new rotor w/o RLM

Customers who are not performing RLM at every C-inspection

150K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

3,800

Additional lifetime starts gained

* please refer to GER3620

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

Rotor Exchange with new rotor with RLM

Customers who are performing RLM at every C-inspection

200K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

5,550 factored fired starts *

Additional lifetime starts gained

*if RLM performed at every C-inspection Recommended to perform RLM at every C-inspection starting at the first outage according to TIL 2178

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

Rotor Exchange with new rotor with RLM

Customers who are performing RLM at every C-inspection

200K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

4,300 factored fired starts *

Additional lifetime starts gained

*if RLM performed at every C-inspection Recommended to perform RLM at every C-inspection starting at the first outage according to TIL 2258

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

Rotor Exchange with new rotor with RLM

Customers who are performing RLM at every C-inspection

200K
factored fired hours of additional lifetime gained *

$$$$

Cost to you

1-3

Major Inspection/C-Inspection intervals gained

4,550 factored fired starts *

Additional lifetime starts gained

*if RLM performed at every C-inspection Recommended to perform RLM at every C-inspection starting at the first outage according to TIL 2259

More details

Your goal:

Prioritizing reliability and technical capabilities. You have a long-term planning horizon for your plant, but you’re also interested in reducing your total rotor costs.

Here's what you get:

Removing and replacing your existing gas turbine rotor with a new rotor from GE Vernova delivers enhanced reliability and performance, advanced equipment and the latest materials--resetting the clock on your rotor at 144,000 or 200,000 hours and 5,000 starts.

This solution is compatible with the following gas turbine types:

GT24,GT26 B2.2, U1 & U2,GT26 ratings < B2.1

FAQ videos

All your questions answered

Take a closer look at our rotor life management and extension solutions.

FAQ #1: Rotor life extension

How do you choose between a start- or hours-based extension? 

FAQ #2: Rotor life and risk

How does changing operating conditions impact your rotor life and risk?

FAQ #3: Compressor packages

Which advanced compressor package is best for your unit?

FAQ #4: Turbine rotor configuration and nickel-based alloy wheel

Why is it important to use wheels that have been properly forged, machined, and processed?

Frequently asked questions

Learn more about rotor life management 

How do you choose between a start- or hours-based extension?

When considering a rotor life extension for your existing rotor, choosing between a start-based or hours-based extension depends on your future operational plans. An hours-based extension allows for up to 5,000 factored fire starts and 240,000 factored hours, which is suitable for turbines that run primarily for long periods. While a starts-based extension permits up to 7,400 starts and a maximum of 192,000 total hours, and it is ideal for operations with frequent starts. Remember that exceeding 5,000 starts in 192,000 hours can lead to creep-fatigue interactions, causing unplanned rotor damage due to cumulative stress and temperature effects. You should decide based on whether you expect more operating hours or starts.

How does changing operating conditions impact your rotor life and risk?

It's essential to recognize that changes in operating conditions directly affect rotor life and risk. As the ratio of operating hours to starts increases, the rotor's risk also grows, leading to potential unplanned issues. Accumulating hours introduces risks such as material creep, hold-time fatigue, and corrosion. Frequent turbine starts further accelerate wear, increasing the risk of low and high cycle fatigue. When this happens, you will reach a point where the risk of running the machine is too high, meaning you are entering your gas turbines mitigation year, which requires careful planning. Assess your annual operating hours to determine when your rotor will reach this milestone, as this may not align with major outages. Operators sometimes choose a rotor swap if there's insufficient time for a full inspection. Starting the planning process early—typically three years in advance—gives you more options to manage risk effectively. 

Which advanced compressor package is best for your unit?

GE Vernova offers five different F-class compressor packages designed based on our fleet experience and years of testing. Each can be installed either as part of a major inspection or even over a long weekend. 

Packages 2 and 2+ are designed for flared units.  

  • Package 2: Involves replacing the R0s and changing the angles of the IGVs, which can be accomplished over a few days. 

  • Package 2+: This option is similar to Package 2, but it's implemented at the hot gas path when the mid-compressor casing is open. It enables the use of new S0 to S4 stator vanes. It minimizes the chance of clashing and can be useful where there's a lot of corrosion. 

Packages 3, 4, and 5 are required for unflared units but can also be used for flared units. 

  • Package 3: This option is implemented at the hot gas path when the mid-compressor casing is open. It requires a more complex software modification that manipulates the IGV angle and compressor bleed valves. This package combines the enhanced IGVs and S5 with improvements to enable high output stage 0. 

  • Package 4: This includes everything from Package 3 but also addresses AFT stator rocking and is implemented during a major inspection when the rotor is removed. Depending on whether machining of the compressor discharge casing is needed, we offer both a little foot and big foot solution for the enhanced stator vanes. 

  • Package 5: All GE Vernova's new units come standard with Package 5. It's similar in scope to Package 4 but is a longer process usually implemented by a seed rotor. A key benefit of Package 5 is the replacement of the front-end compressor blades. 

Why is it important to use wheels that have been properly forged, machined, and processed?

Using wheels that have not been properly manufactured and processed can result in forced downtime, longer outages, and performance and emissions issues. The process of creating rotor wheels is extremely complex and has been developed by GE Vernova and our suppliers for over 50 years. GE Vernova has millions of operating hours on its nickel-based alloy wheels, and based on lessons learned and proprietary analysis, we have made more than 30 design modifications to the 7FA gas turbine rotor. This vast experience, coupled with design analytics and inspection data, has given us a full understanding of the capability of these wheels.

What is rotor corrosion and how does it impact my rotor?

Corrosion is a natural process that degrades material and its properties. It's caused by environmental factors that can allow contaminants to get into the gas turbine from the air, water, or fuel. Airborne contaminants can be introduced in conditions like coastal or offshore climates. Water can also cause corrosion if not properly treated per GE Vernova specifications. Fuels should also be managed properly to avoid corrosion in the hot section of the gas turbine.

What can you do? First, ensure your filter house and inlet are consistent with your ambient environment conditions and GE Vernova recommendations. If you see corrosion during outages, consider upgrading your filters. You should also adhere to fuel or water specifications and follow inspection recommendations.

What goes into rotor life management?

GE Vernova's rotor life management strategy consists of 3 pillars: Analytical assessments, operational experiences, and variation sources. Analytical assessments are performed with computer models to understand better the physics associated with rotor life. Operational experiences refer to how the unit runs in its environment – for example, the number of hours and starts coupled with our findings in the services shops. Variation sources are other factors that can change the maintenance recommendations for the rotor, such as corrosion or running in a corrosive environment. As the B, E, and F fleet continue to run, our life recommendations correlate with fleet experience, and we've developed inspections and repairs accordingly.

Why is configuration management important when installing GE Vernova's compressor packages on my gas turbine?

GE Vernova has developed our compressor packages with full instrumented testing, design analytics, and fleet operating experience. In addition, we have made 10 compressor rotor design changes and hundreds of blade design changes on the 7FA gas turbine over the past 30 years, so we have a comprehensive understanding of the configuration. When a configuration is not fully analyzed by GE Vernova engineering, errors can result in outage delays of several months and performance losses of more than 5 MW. 

Why is it important to use a qualified inspection process and tooling during rotor life management?

GE Vernova's inspection criteria are based on years of analytical modeling and inspection data in shops or the field. Addressing inspection findings requires engineering knowledge of the rotor system, and inspecting equipment also requires calibration and maintenance. GE has completed thousands of gas turbine inspections in the shop and field.

Contact us

Want to learn more about gas turbine rotor life management and extension?