The challenge
Indonesia’s growing energy needs, coupled with its commitment to phase out coal and achieve net-zero emissions by 2060, required a new solution for cleaner, flexible, large-scale power generation.
The solution
GE Vernova provided the Tambak Lorok power plant with a 9HA.02 gas turbine, an STF-D650 steam turbine, and a Heat Recovery Steam Generator (HRSG), delivering flexible, efficient, and lower-emission power to the Java grid. The project also includes a 12-year service agreement for ongoing maintenance and operational support.