Overview

Saudi Electricity Company (SEC) has awarded 5 stars to the Waad Al Shamal integrated solar and combined cycle power plant project for Environment, Health and Safety (EHS) standards.

Background

GE Gas Power won the contract for SEC’s Waad Al Shamal project, which also includes 50 MW of solar power, in late 2015. All four GE 7F gas turbines at the plant can now operate in simple cycle configuration. Combined cycle commissioning works are ongoing and once complete, the facility will be able to generate up to 1,390 MW of power, the equivalent electricity needed to supply over 500,000 Saudi homes.

The award

SEC has set rigorous EHS protocols for project sites around workplace hygiene and housekeeping, lifting heavy loads, lighting and ventilation, waste management and other areas, with regular audits conducted by the Industrial Security Department. To be granted a 5-star rating, organizations not only have to help meet the defined criteria but also have to demonstrate that they are continuously adhering to them.

Outcomes

Building a five-star plant

500,000

Saudi households powered (equivalent electricity)

4 billion

barrels of oil saved

7F availability

"

At SEC, we continuously assess progress against strict measures meant to ensure occupational safety and health across all our offices, existing facilities and projects. We are delighted to work with an industry leader such as GE that has demonstrated a clear commitment to upholding strict EHS standards and congratulate them on this 5-star rating.

Fahad H. Al-Sudairi

President and CEO, SEC

content-waad-al-shamal-power-plant.jpg

For Waad al Shamal, GE is providing turnkey services, including engineering, procurement and construction (EPC) works, and supplying four GE 7F gas turbines, one steam turbine and four heat recovery steam generators (HRSGs), as well as other equipment for the project. One of the turbines at the site is the first GE gas turbine rolled out locally in the Kingdom from GE Saudi Advanced Turbines (GESAT) - a joint venture (JV) between Dussur and GE.

Additionally, GE has dedicated site leaders, staff training programs and its own internal audits to implement and monitor EHS standards at the Waad Al Shamal project.

Moreover, strict measures have been implemented to enable project staff to continue working safely following the COVID-19 outbreak. These measures include thermal screening of everyone entering the site, daily active random screening of staff at site by medical personnel, daily disinfection and cleaning activities, distribution of mandatory personal protective equipment (PPE) such as gloves and masks, COVID-19 awareness sessions, prevention training and educational materials in different languages, as well as other precautions.